power6的550安装划分区步骤!!

10月国庆过完之后回来就有很多事情等着做,首先就是去安装一台POWER6的550机器,先看下e-config的配置:ProductDescriptionQty8204-E8AServer 1:System p 5501265AIX Partition Specify11877Op Panel Cable for Rack-mount Drawer w/3.5 DASD13647146 GB 15K RPM SAS Disk Dri...显示全部
10月国庆过完之后回来就有很多事情等着做,首先就是去安装一台POWER6的550机器,先看下e-config的配置:
Product
Description
Qty
8204-E8AServer 1:System p 5501
265AIX Partition Specify1
1877Op Panel Cable for Rack-mount Drawer w/3.5 DASD1
3647146 GB 15K RPM SAS Disk Drive2
3669SAS Cable, DASD Backplane (Split) to Rear Bulkhead1
3679SAS Cable (AI)- 1M1
45212048MB (2x1024MB) RDIMMs, 667 MHz, 512Mb DRAM2
4650Rack Indicator- Not Factory Integrated1
49662-core 4.2 GHz POWER6 Processor Card1
4986One Processor Activation for Processor Feature #49662
5005Software Preinstall1
5623Dual-Port 1Gb Integrated Virtual Ethernet Daughter Card1
5756IDE Slimline DVD-ROM Drive1
5912PCI-X DDR Dual - x4 3Gb SAS Adapter1
6458Power Cable -- Drawer to IBM PDU, 14-foot, 250V/10A1
6671Power Cord (9-foot), Drawer to IBM PDU, 250V/10A1
7146IBM/OEM Rack-Mount Drawer Rail Kit1
7360IBM Rack-mount Drawer Bezel and Hardware1
7707Power Supply, 1700 Watt AC, Hot-swap, Base and Redundant2
8341DASD/Media Backplane for 3.5 DASD/DVD/Tape1
9722Language Group Specify - Simplified Chinese (PRC)1
收起
参与58

查看其它 57 个回答zzcandylyan的回答

zzcandylyanzzcandylyan系统架构师荣科科技股份有限公司
受教 p6的虚拟化需要SAS卡
最好能再上个图片与过程
感谢楼主
系统集成 · 2010-10-28
浏览2366

回答者

zzcandylyan
系统架构师荣科科技股份有限公司

zzcandylyan 最近回答过的问题

回答状态

  • 发布时间:2010-10-28
  • 关注会员:0 人
  • 回答浏览:2366
  • X社区推广